Your approval comes with conditions. We help you meet them and prove it โ on time, every time.
Every environmental clearance comes with specific and general conditions that apply for the life of the project. Under the EIA Notification, 2006, project proponents must submit half-yearly compliance reports on those conditions by 1 June and 1 December each year, to the MoEFCC regional office and the State Pollution Control Board.
Units that hold consents must also file an annual Environment Statement (Form V) under the Environment (Protection) Rules, 1986, due by 30 September.
Miss these, or file with gaps, and it shows up at next inspection or when you apply for expansion.
Specific + general conditions โ line by line status
Air, water, noise results from recognised labs
Greenbelt, APC, ETP/STP, safety systems
MoEFCC regional office + SPCB, with archive copy
For your EC and consents โ live tracker, no missed clause.
Data from NABL labs, formatted condition-wise.
Prepared, reviewed and uploaded on time.
Form V filing by 30 Sept each year.
Before inspections or expansion applications.
Help with observations from MoEFCC / SPCB.
We keep the calendar, gather the data and prepare reports that hold up in inspection.
We go through EC and consent letters line by line and build a tracker.
Monitoring results, records and photographs, gathered ahead of deadline.
Draft checked against each condition, shared with you for sign-off.
Filed on time, with copies kept so you're ready for any inspection.