Get in Touch

Edit Template
● PFR, FORM 1 & FORM 1A PREPARATION | VRC INDIA

Pre-Feasibility Report (PFR), Form 1 & Form 1A

The documents that start your environmental clearance, prepared properly the first time. Fewer queries, smoother appraisal.

PARIVESH Filing
Form 1 EC Application
Form 1A + Conceptual Plan
Query Handling
DOCUMENT SETEC READY
πŸ“„
Form 1

Main EC application for all covered projects

πŸ“‘
Pre-Feasibility Report

Project, site, process & likely impacts

πŸ—οΈ
Form 1A + Conceptual Plan

For building & area development projects

βœ“ Land, water & power details cross-checked across all docs
● WHY THESE DOCUMENTS MATTER

First impression is everything.

Form 1 is the application for prior environmental clearance, and it's filed together with a Pre-Feasibility Report that describes the project, the site, the process and its likely impacts. Building, construction and area development projects also file Form 1A, along with a conceptual plan.

These are the first documents the appraisal committee reads. If details are missing or don't match, the application comes back with queries and the clock resets. A careful first submission is the quickest route there is.

What goes wrong with weak filing?

  • Queries at Day 1: Land vs water vs power numbers don't match
  • Clock resets: PARIVESH sends back, 15-20 days lost
  • EAC asks again: Same question in appraisal meeting
  • Our fix: One checklist, one cross-check, zero mismatch
● WHAT WE PREPARE

Everything needed for first-time acceptance.

01
πŸ“‘

Pre-Feasibility Report

Covering project, site, process, resources and environmental aspects.

02
πŸ“„

Form 1 with annexures

All supporting annexures, maps, layouts and undertakings.

03
πŸ—οΈ

Form 1A & conceptual plan

For building and area development projects β€” land use, water, energy, waste.

04
βœ“

Consistency check

Land, water and power details checked for consistency across every document.

05
πŸ’»

PARIVESH filing + follow-up

Online submission on PARIVESH and handling of any queries till acceptance.

Ready for EIA next?

Once Form 1 / PFR accepted, we directly take you to ToR & EIA without rework.

SEAMLESS HANDOFF β†’

What we'll need from you

Simple list to start β€” full project-specific checklist after first call.

πŸ“‹
Project description

Capacity / built-up area & location

πŸ—ΊοΈ
Land & layout

Land docs + site layout / master plan

πŸ’§
Water & power

Requirements + source confirmation

βš™οΈ
Process / building plans

As applicable to project type

Note: We'll share a full, project-specific checklist after the first call β€” so you don't chase unnecessary papers.
How we keep it easy β†’
  • One call to lock checklist
  • Template shared for data gaps
  • We draft, you review β€” no back & forth
  • Only file when numbers are firm
● FAQ

Frequently asked questions

What's the difference between Form 1 and Form 1A? +
Form 1 is the main EC application for all covered projects. Form 1A is additionally required for building, construction and area development projects, and focuses on matters like land use, water, energy and waste for those developments.
Can you prepare the PFR if our project design isn't final? +
We can start with what you have and update the figures as the design settles. We'll only file once the numbers are firm, because changes after filing cause delays and queries in appraisal.